Project Description
Construction Technique and Details
Heavy duty truck ramp with 6 m width, with a total length of 175m, 8% inclined 7m high opening-filling method, reinforced concrete precast with retaining walls, earth filled and 4 ton / m2 moving load capacity
Project Details
Customer | Resinex-Bmy Plastik Kimya A.Ş. |
The Name of the Work | Static project of heavy duty truck ramps and retaining structures of gebze, çayırova factory buildings and construction as main contractor |
Place of Work | Çayırova, Gebze, KOCAELİ |
Starting & Ending Date of Work | 09.01.2004 – 15.02.2004 |