Project Description

Construction Technique and Details

4.400m² closed area 3 (1. Basement, Ground Floor, Normal Floor) reinforced concrete building, 6,5m under-girder height, 2ton / m² moving load capacity on each floor cassette flooring, steel roof system with 20m open roof rafters.

Project Details

Customer Tes-İş Construction Engineering
The Name of the Work Construction drawings
Place of Work Suadiye, Kartepe, KOCAELİ
Starting & Ending Date of Work 01.05.2009 – 31.08.2013