Loading...
DEKA ELECTROTECHNICAL2019-03-08T14:55:40+00:00

Project Description

Construction Technique and Details

625 m2 reinforced concrete raft foundation on concrete basement floor (h: 3.8m) + steel construction 1 ground floor (h: 6m), over 23m free span castella beam steel roof, 2 ton / m2 moving load capacity storage building and

Steel construction consisting of 1,025 m2 reinforced concrete continuous foundation, 1 ground floor (h: 6m), 23 m free span steel roof, 2 tons / m2 moving load capacity factory building and 60 m2 raft foundation, 50 ton capacity water tank boiler room buildings, total session area 1,710 m2 and total usage area 2,335 m2 factory and warehouse buildings

Project Details

Customer Deka Elektroteknik Ltd. Şti.
The Name of the Work Gebze Factory Building-2 And Warehouse Building Static Projects And Main Contractor Construction
Place of Work Çayırova, Gebze, KOCAELİ
Starting & Ending Date of Work 20.06.2002 – 28.12.2002